Dienstag, 22. April 2008

Attic work....



This is why I´m absent so long. I develop our attic just by myself. This is really a lot of work when you are absolutely up to yourself. And after the last 3 to 4 month I´m still not so far as I hoped to be.
My husband is still working in the US and now I´m near SanFrancisco for the next 3 month too. I can recover from the last months. And restart in july with the next stage of work up the attic. In the end this should be our new bedroom (In the part you can see at the pictures) The other side is going to be my new atelier/workspace. I can´t wait to have this place finally.

But the work in our house will go on. After the bedroom has moved one level up, there is space for a diningroom downstairs. I will remove a wall there to get an open floorplan. Hope I will find someone strong to help me with this....


But now I´m on vacation and will enjoy the california way of life. And hopefully more sun than in germany.


Related Posts Plugin for WordPress, Blogger...